首页> 外文会议>Geosynthetics Conference >Construction and Post-Construction Construction Monitoring of a Landfill MSE Perimeter BackfillPerimeter Berm over Soft Mine BackfillPerimeter Berm over Soft Mine BackfillPerimeter Berm over Soft Mine Backfill
【24h】

Construction and Post-Construction Construction Monitoring of a Landfill MSE Perimeter BackfillPerimeter Berm over Soft Mine BackfillPerimeter Berm over Soft Mine BackfillPerimeter Berm over Soft Mine Backfill

机译:垃圾填埋场覆盖物压填埋场压填埋电表挤压软矿后挤压率的施工和施工后施工监测软矿回填仪对软矿井回填

获取原文

摘要

A former sand and clay mine in the northeastern United States is the site of an operating municipal waste landfill containing a mechanically-stabilized earth (MSE) berm around the perimeter of the disposal area. A portion of the site contains an appreciable thickness (5 to 8 meters) of mine spoils consisting of a heterogeneous mix of clay, silt, and fine to medium sands which were placed in an “unengineered” manner. Geotechnical investigations were performed to determine the in-situ shear strength of the fill and natural soils for use in design of the liner system subgrade and MSE berm. To evaluate the impact of coarse fragments (>2.5 cm) in the proposed reinforced fill for the MSE berm, a test fill was constructed in the field during the design phase using geogrid products of various tensile strengths to determine the appropriate reduction factor for installation damage. The test fill resulted in adjustments to the assumed reduction factor and allowed for a modification of the gradation specification of the reinforced fill to accommodate available fill sources. A geotechnical instrumentation program was implemented during construction and subsequent operation of the landfill, and included slope inclinometers to monitor for horizontal displacements within the MSE berm and vibrating wire piezometers to measure pore pressures in the foundation soils. Data collected to date indicate that movements within the MSE berm and pore pressures in the foundation soils have been within anticipatable ranges and landfill development and waste placement operations have continued with no disruption.
机译:美国东北部的前沙子和粘性矿石是经营市政废物垃圾填埋场的网站,含有围绕处置区的机械稳定的地球(MSE)塞热状物。该部位的一部分含有可明显的厚度(5至8米)的矿物破碎物,其由粘土,淤泥和细至中等砂体的异质混合物组成,所述中等砂体置于“不承诺”方式。进行了岩土性研究以确定填充和天然土壤的原位剪切强度,用于设计衬里系统路基和MSE PERM的设计。为了评估粗碎片(> 2.5cm)的粗碎片(> 2.5cm)在提出的MSE BERM中的影响,使用各种拉伸强度的地质格子产品在设计阶段,在设计阶段构建测试填充,以确定安装损坏的适当减少因子。测试填充导致对假设的还原系数调整,并允许改进增强填充的灰度规格以适应可用的填充源。在施工和随后的垃圾填埋场操作期间实施了岩土工程仪器,包括斜坡倾角仪,以监测MSE放电和振动线压力计的水平位移,以测量基础土壤中的孔压力。数据收集日期表明MSE护堤和孔隙压力在地基土内的运动已经anticipatable范围和垃圾填埋场的开发和放置废物经营中继续,而不会中断。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号