首页> 中文期刊> 《矿物冶金与材料学报:英文版》 >Reliability of paste fill system of the Jinchuan No.2 mine

Reliability of paste fill system of the Jinchuan No.2 mine

         

摘要

Because of poor ground conditions, stoping methods of underhand headings with cemented fill were used in the Jinchuan No. 2 mine, a paste fill system was set up. In order to evaluate the reliability of the new system, investigations and trial running have been done. More than 20 items of modification or improvements related to paste preparation subsystem, pump and pipe subsystem, auto-controlling and monitoring subsystem were finished. The reliability of the paste fill system was analyzed by using the theory of large complex system, and it is useful in reliability study on paste fill system.

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号