首页> 中文期刊>矿物冶金与材料学报 >Applications of optimal mathematic-physical models in metallurgical manufacture scheduling system at Baosteel

Applications of optimal mathematic-physical models in metallurgical manufacture scheduling system at Baosteel

     

摘要

The transfer of mass flow between ironmaking and steelmaking process at Baoshan Iron and Steel Co. Ltd. has been analyzed. The mathematic-physical models of transport scheduling for hot metal manufacturing have been researched combined with the practical problem in the metallurgical manufacture procedure. Taking into account these models, the scheduling software has been designed, programmed and tested on-line. The new automation system of production scheduling has been implemented successfully at Baosteel, which produces a great economic benefit.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号