首页> 中文期刊>黑龙江水利科技 >引水发电洞压力钢管洞内运输与安装方法

引水发电洞压力钢管洞内运输与安装方法

     

摘要

Large diameter pipes were used in a water conservancy diversion tunnel penstock and bifurcated pipe,and they need to be manufactured and installed on site, further more the construction area is small, with the cross operation, big pipe section, weight lifting, many links. This paper introduces the concrete measures of rail transportation and inversion method for the large diameter pressure pipe in the construction area,construction conditions under the insufficient condition.%某水利枢纽引水发电洞压力钢管及岔管管径大,而且需在现场制作安装,而施工区域小,交叉作业多,管节大,吨位重,吊装环节多。文章介绍了大管径压力钢管在洞内施工区域小、施工条件不足的情况下,采取洞内轨道运输、倒装的具体措施。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号