首页> 外文会议>Proceedings of '99 international conference on dam safety and monitoring >Dynamic monitoring of the diversion steel pipes for power genertion at baishan hydropower plant
【24h】

Dynamic monitoring of the diversion steel pipes for power genertion at baishan hydropower plant

机译:白山水电站发电引水钢管动态监测

获取原文
获取原文并翻译 | 示例

摘要

In the lahout of the Baishan secon datage hydropower plant, the self-supporting property of the hending section of the exposed headrace steel pipes with large diameters were made use of. In order to know the operating behaviour of the steel pipes and direct operation, dynamic monitoring on the exposed pipe section was crried out. By using the dynamic data acquisition and analysis system, the vibration data at different locations and on different direction under 8 operatin conditions of the units were sampled, and the dynamic behaviour of the headrace steel pipes was studied.
机译:在白山赛康大水电站的厂房内,利用了裸露的大直径钢管的弯曲部分的自支撑特性。为了了解钢管的操作行为和直接操作,对裸露的管段进行了动态监控。利用动态数据采集与分析系统,对机组在8种运行条件下不同位置,不同方向的振动数据进行了采样,研究了头枕钢管的动态行为。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号