Calculation of earthwork quantity is important for belt water project. Because there is no special calcula-tion software up to now, this calculation requires considerable work and much time with results of relative poor reli-ability. The author compared the similarity between belt water project and road project, and adopted road engineer-ing software to calculate earthwork quantity of water project.%带状水利工程建设过程中土石方工程量的计算是一项重要内容,目前还没有专用的工程软件,通常做法工作量较大,效率较低,计算成果可靠性相对较差。通过对比带状水利工程与道路工程的相似性,引用道路工程软件解决水利工程土石方工程量的计算难题。
展开▼