为了合理确定铜鼓河整治工程中拦河建筑物结构形式,拟定了常规水闸、橡胶板、水力自控翻板闸3个方案,从功能要求、运行管理、施工、景观及投资等方面进行对比分析,最终推荐采用水力自控翻板闸方案。%In order to reasonably determine the structure types of Tonggu river regulation engineering of sluice, three schemes have been drawn up on conventional sluice, rubber dam, and hydraulic automatic flap gate.From the aspects of functional requirements, operation management, construction, landscape and investment, contrast analysis has been carried on, finally, the hydraulic auto-matic flap gate scheme is recommended.