首页> 外文期刊>Water and Energy International >PLANNING OF RIVER TRAINING WORKS -FARAKKA BARRAGE PROJECT — A CASE STUDY
【24h】

PLANNING OF RIVER TRAINING WORKS -FARAKKA BARRAGE PROJECT — A CASE STUDY

机译:河流训练工程的规划-FARAKKA拦河项目-案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

The Farakka Barrage Project on river Ganga, commissioned in the year 1975, mainly for diversion of 1135 cumec flow of water from river Ganga to river Hoogly through Bhagirathi, for the preservation of Kolkata Port, is a project of national importance.River Ganga due to its meandering nature is causing bank erosion problems not only in the vicinity of barrage but also in the reaches far upstream and downstream of the barrage. The bank erosion problem was existing even much before the construction ofFarakka barrage. This paper attempts to analyse the probable causes of bank erosion problems. An attempt has been made to identify the potential vulnerable reaches requiring anti erosion measures. Causes of shoal formation especially near the barrage andways for removal of the same has also been discussed. The paper also discusses various precautions to be taken while planning, designing and execution of anti-erosion works. Certain new construction materials have also been suggested in the paper for improving the performance of anti erosion works.
机译:甘加河的Farakka拦河坝项目于1975年启用,主要用于将1135立方公尺的水从甘加河分流到Bhagirathi的霍格利河,以保护加尔各答港口,是一项具有国家重要性的项目。它的曲折性质不仅在弹幕附近而且在弹幕上游和下游的河段都引起堤岸侵蚀问题。银行侵蚀问题甚至早在法拉卡大坝建造之前就已经存在。本文试图分析银行侵蚀问题的可能原因。已尝试确定潜在的易受伤害地区,需要采取防腐蚀措施。还讨论了浅滩形成的原因,尤其是在拦河坝附近以及去除浅滩的途径。本文还讨论了在规划,设计和执行抗腐蚀工程时应采取的各种预防措施。本文还建议使用某些新型建筑材料来提高抗腐蚀工程的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号