By Yangjiang Pumped Storage Power Station Project area topography, meteorology, hydrology, soil and vegetation analy-sis, soil erosion status quo, the original spoil field program of the main project has been adjusted to optimize the program spoil haul around sensitive points, soil and water conservation measures have been well improved.%通过阳江抽水蓄能电站工程项目区地形地貌、气象、水文、土壤植被、水土流失现状的分析,对原主体工程渣场方案进行了调整,优化方案在弃渣运距、周围敏感点、水保措施等方面均得到了较好的改善。
展开▼