For the design of Pearl River's new water bus, this paper describes the arrangement of main mechanical equipment for shafting, calculation and selection of main technical parameters, phenomenon occurred in the process of actual construction and test of propulsion system, checks the calculation with a shafting calculation software to further prove the consistency of theoretical calculation and practical application of shafting.%在广州珠江新型水上巴士设计中,通过对轴系主要机械设备的布置与分析、主要技术参数的计算与选取,以及在实际建造与试验过程中推进系统发生的现象进行剖析,并采用轴系计算软件进行复核计算,进一步的判断轴系理论计算与实际应用的一致性。
展开▼