风电海底电缆典型敷设施工

         

摘要

介绍了海底电缆敷设施工的工艺流程,指出敷设工程的质量控制要点和内容,并从防火、抵抗风浪、作业安全和警戒保卫等方面建立危险源安全保障要点。所建立的海底电缆敷设施工质量和安全保障体系在国家高技术研究发展计划示范工程---大型风电场柔性直流输电接入技术研究与开发项目中应用,结果表明能有效地满足高压海底电缆现场施工的需要。%This paper introduces technical flow of laying construction of wind power submarine cable and points out key points and contents of quality control.In aspects of fire protection,storm resistance,working safety and alert defense,it discusses establishment for key point of danger source security assurance.The quality and security assurance system of estab-lished submarine cable is applied in national high technology research and development planning demonstration project-flexi-ble direct current power transmission and connection research and development project in large scaled wind power sta-tion.The application result indicates that the laying construction of the submarine cable is effectively satisfying requirement for field construction of high voltage submarine cable.

著录项

  • 来源
    《广东电力》 |2014年第6期|77-79104|共4页
  • 作者

    唐蔚平; 薛雷刚; 王志强;

  • 作者单位

    中国能源建设集团广东省电力设计研究院;

    广东 广州510663;

    中国能源建设集团广东省电力设计研究院;

    广东 广州510663;

    中国能源建设集团广东省电力设计研究院;

    广东 广州510663;

  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类 TM757.4;
  • 关键词

    海底电缆; 敷设; 质量控制; 危险源;

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号