At Nanjing iron and steel eoking plant, coke dry quenching operation area in the production process of system pressure has encountered some problems, coke dry quenching operation area in the relevant technical staff through the control operation, equipment essential problems in all aspects, to find the cause of CDQ system is the basic reason of abnormal pressure, solves the problem of CDQ system, realized stable production target.%南钢焦化车间干熄焦作业区在生产过程中系统压力方面所遇到的一些问题,干熄焦作业区会同相关技术人员通过中控操作、设备本质问题等各方面入手,找到造成干熄焦系统压力异常的根本原因,解决了问题,实现了干熄焦系统稳定生产的目标。
展开▼