首页> 中文期刊> 《黄金》 >大红山铜矿胶结高矿柱强度设计及工程实践

大红山铜矿胶结高矿柱强度设计及工程实践

         

摘要

Cemented filling pillars of Dahongshan Copper Mine are “high,narrow and long”,and must be respon-sible for the stopping of two adjacentore chambers .Its long exposure period requires much about the stability ,integrity and strength design of the cemented fill pillar and the filling process .Take B88-92-3 panel for example , analysis holds that the experience analogy method and model method are clumsy in the strength design of cemented filling body.A numerical model of the panel is established by FLAC 3D software,the parameters of cemented filling body that cause shear failure are determined by calculation of elastic solution .The parameters of the cemented filling body that maintain stability are determined by elastic-plastic solution .The engineering practice showes that the cemented filling body remains stable when the value of cohesion is 0.8 MPa,tensile strength is 0.6 MPa,internal friction angle is 31° and compressive strength is 2.78 MPa.%大红山铜矿胶结充填矿柱具有“高、窄、长”的特点,并且矿柱充填体须服务相邻2个矿房的回采,暴露周期长,对充填体的稳定性、整体性和强度设计及充填实施提出了很高的要求。以B88-92-3盘区为例,通过分析确定,经验类比法和模型法很难用于胶结充填体强度设计。应用FLAC3D软件建立该盘区数值模型,通过弹性方案计算确定胶结充填体发生剪切破坏的参数,在此基础上利用弹塑性方案确定胶结充填体保持稳定的参数。工程实践表明,充填体在内聚力0.8 MPa、抗拉强度0.6 MPa、内摩擦角31°和抗压强度2.78 MPa条件下保持稳定。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号