针对福州市水系治理在完成清淤截污补水工程之后,部分河道水动力不足的问题,在全国范围内首次引入一种新型设备——一体化智能泵闸系统.文章阐述了一体化泵闸的原理、构造、运行工况及优缺点等,最后结合陆庄河泵闸建设的工程实践,介绍了泵闸施工工序、施工关键点及运行效果.实践表明,一体化泵闸对解决河道水动力不足有显著作用,同时对河道的排涝也有一定的辅助作用,具有较强的推广价值.%In order to solve the problems of insufficient hydrodynamic forces caused by the completion of dredging, interception and replenishment project construction in Fuzhou City, a new type of equipment, integrated pumping equipment, was introduced for the first time nationwide. This text elaborates the principle, structure, operating conditions of the integrated pump lock and the advantages and disadvantages compared with the traditional pump lock. Finally, combined with the engineering practice of Luzhuanghe pump gate construction, the construction process of the pump gate, key construction points, are introduced. Proven in practice, the integrated pump gate plays a significant role in solving the problem of insufficient hydrodynamic force of the river, effect. It has a certain auxiliary effect on the drainage and drainage of river channels and a high promotion value.
展开▼