通过对烧结物料硫来源的分析,采取烧前结构优化减少硫的带入和烧后脱硫系统设备改造提高脱硫效率,实现达标排放.%Sintering material source of sulfur dioxide were analyzed, the structure optimization to re-duce sulfur dioxide by adopting burned into and burn the desulfurization system after equipment modi-fycation to improve the desulfurization efficiency, achieved national standards.
展开▼