首页> 中文期刊>工程抗震与加固改造 >某深水码头集装箱堆场改建工程强夯试验监测与加固效果评价

某深水码头集装箱堆场改建工程强夯试验监测与加固效果评价

     

摘要

Contrary to the requirements of reinforcement design of site at an expansion project of port berth in Shenzhen, two groups ofdynamic compaction test are designed, and through detecting the tamping test results with different dynamic compaction constructionparameters, the reinforcement design parameters are determined. By the monitoring to surrounding environment, it is proved that theaffect brought by dynamic compaction construction is small, and the ports near the construction site, retaining wall, workshop and somestructures are safe in this test. On the base of test results, the dynamic compaction construction parameters of this project areconfirmed.%针对深圳某港口泊位扩建工程场地加固设计要求,设计两组强夯试验.通过对不同强夯施工参数夯击试验效果的检测,确定强夯加固设计施工参数.同时通过监测强夯试验对周围环境的影响,证明强夯施工对周围环境影响较小,施工场地周围码头、挡土墙和厂房等构筑物在强夯试验中安全,最终确定了本工程的强夯施工参数.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号