采用 MIDAS 分析软件,对某变截面连续梁桥施工阶段和运营阶段进行结构分析,总结此类桥型在两种状态下的受力模式,为类似桥梁工程建设提供借鉴。%This paper analyzes the structure stress of variable cross -section continual beam bridge during its construction and service stage using MIADS,summarize the bearing mode of these stage for this kind of brige ,to provide reference for similar bridge construction.
展开▼