保护层卸压开采两煤层终采线合理位置确定

     

摘要

In order to study the stress distribution evolution of the surrounding rock during the protective seam mining process and to study the dynamic law influenced to the front floor gateway, based on the transmission law of the mining support stress in the front seam and seam floor, the FLAC2D was applied to simulate and analyze the surrounding rock stress distribution features of the mining face with differ- ent coal pillar width under the protective seam mining process in No. 11 seam as in No. 13 seam. The FLAC2D was also applied to monitor and measure the surrounding rock deformation of the gateway. The results showed that during the low protective mining process, 110 m coal pillar left could reduce the mining activities affected to the front floor gateway and when the mining operation was in the top protected seam, the final terminal mining lines set for the two seams should be eliminated at the same location and the distance between the two lines should be 30 - 50 m in order to reduce the overlying influences of the mining stress.%为了研究保护层开采过程中围岩应力分布演化及其对前方底板巷的动态影响规律,基于采动支承压力在煤层前方及底板内的演化规律,运用FLAC^2D模拟分析了淮南矿区11煤作为13煤下保护层开采过程中在不同煤柱宽度下的采场围岩应力分布特点,并进行了巷道围岩变形监测。结果表明:下保护层开采过程中,留110m煤柱可以减弱采动对前方底板巷道的影响,当开采上方解放层时,应避免两煤层终采线留设在同一位置,错距为30—50m,可以减少采动应力叠加影响。

著录项

  • 来源
    《煤炭科学技术》|2012年第2期|15-18,39|共5页
  • 作者单位

    安徽理工大学能源与安全学院,安徽淮南232001/煤矿安全高效开采省部共建教育部重点实验室,安徽淮南232001/中国矿业大学煤炭资源与安全开采国家重点实验室,江苏徐州221008;

    安徽理工大学能源与安全学院,安徽淮南232001/煤矿安全高效开采省部共建教育部重点实验室,安徽淮南232001;

    安徽理工大学能源与安全学院,安徽淮南232001/煤矿安全高效开采省部共建教育部重点实验室,安徽淮南232001;

    安徽理工大学能源与安全学院,安徽淮南232001/煤矿安全高效开采省部共建教育部重点实验室,安徽淮南232001;

  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类 巷道压力;
  • 关键词

    保护层开采; 终采线位置; 围岩应力; 煤柱宽度;

  • 入库时间 2023-07-24 21:21:25

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号