Through the analysis of Heqing manganese mine's actual situation,combined with the production requirements,we calculate the pit mines (waste) stone transport speed and the quality of wire rope requirements,in order to design for tramcar.%通过分析云南鹤庆锰矿的矿井实际情况,结合开采要求,计算了坑内矿(废)石运输的提升速度和钢丝绳的质量要求,以此对矿车进行了设计.
展开▼