首页> 中文期刊> 《中国勘察设计 》 >青海玉树治多影剧院大跨度结构设计探析

青海玉树治多影剧院大跨度结构设计探析

             

摘要

The "4·14 Earthquake" in 2010 has caused the serious damage to the local, in Yushu Prefecture, Qinghai Province and Zhiduo Country was also affected. Our institute responded positively to the cal of the CPC Central Committee and the State Council and was initiative to undertake the task of planning and architectural design for the Zhiduo Country. The structural design project of grand theatre used as the landmark building of the Zhiduo Country, are required with the large span, irregular plane and section structure, long cantilever beam. The selection of inclined shores makes structure more reasonable, service space larger. By contrasted with the results of SATWE, PMSAP ( SpasCAD ) and Midas Gen in the structural design calculation, there were the more reasonable vertical member layout and more perfect whole structure.%2010年青海玉树"4·14地震"后,甘肃省建筑设计研究院响应党中央国务院的号召,主动承担了玉树州治多县的灾后重建规划和建筑设计任务,其中,治多影剧院作为当地标志性建筑,具有跨度较大、楼层错落不齐、平面结构布置不规则、悬挑较长等特点.该项目设计具有通过斜支撑柱使结构更经济、使用空间更大;结构计算设计通过SATWE、PMSAP (SpasCAD)及Midas Gen复核对比,使之竖向构件布置更合理、整体结构更完美.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号