根据我司设计的一个LNG调峰应急站的详细设计,从工艺流程,设备布置及配管设计等方面,详细介绍了LNG液化装置的干燥单元的工艺流程,设备布置及配管设计要点.%According to the detail design of Tianjin Gas Dagang LNG Emergency Peak-shaving station project, the main points of process and piping design for LNG liquefaction plant dehydration unit are described in detail from the equipment layout, as well as process and piping design.
展开▼