During the construction of oil drilling,it is necessary to cement the well,reinforce the annular space between the casing and the well wall,and improve the stability of the wellbore.In order to improve the quality of cementing construction,optimize the design of cementing procedures,select the best cementing equipment,strengthen the maintenance of mechanical equipment, improve the efficiency of safe operation of the equipment,in order to ensure the smooth implementation of cementing,better To complete the cementing task.%石油钻井施工过程中,需要进行固井,加固套管和井壁之间的环形空间,提高井筒的稳固性.为了提高固井施工的质量,优化设计固井施工程序,选择最佳的固井机械设备,加强对机械设备的维护保养,提高设备安全运行的效率,才能保证固井施工的顺利实施,更好地完成固井施工任务.
展开▼