Comprehensive Partnering Management Model for Highway Construction Projects Delivered Using Traditional and Alternative Methods

机译:使用传统方法和替代方法交付的公路建设项目的全面合作伙伴管理模型

获取原文
获取原文并翻译 | 示例

摘要

This dissertation is designed to explore the use of partnering as a decision tool for improving highway construction project performance regarding the project delivery method used by the transportation agencies. Project partnering was implemented in response to project performance issues that are often caused by the adversarial relationships that characterize the industry. Partnering is a tool to improve relationships by providing a framework for open communication and joint problem solving whose goal is to obtain win/win outcomes. Despite the widespread use of partnering, the literature review did not reveal previous research that quantifies the costs and benefits of implementing partnering over an extended period of time.;The following three issues are of primary concern to all public transportation agencies during project development and delivery: (1) selecting the appropriate project delivery method, (2) maximizing project cost/time certainty while minimizing disruptions due to disputes, and (3) ensuring proactive project quality management while creating a safe environment for both workers and the traveling public.;The increased use of alternative project delivery methods has caused the above issues to become increasingly interrelated and created a project management challenge for state departments of transportation (DOT). Not only do these projects allow concurrent design and construction, but they also move at a faster pace, which demands a much higher degree of both integration and active collaboration to meet the demands of an aggressive schedule. Initially implemented by the Arizona DOT in 1996, partnering has been found to be an effective tool for creating the necessary atmosphere for honest, information-rich communication between the owner and its design consultants and construction contractors. However, the American Association of State Highway and Transportation Officials (AASHTO) Partnering Handbook was published in 1998 based only on traditional low bid project delivery and as such does not include guidance for partnering projects delivered using alternative contracting methods (ACM).;This dissertation aims to contribute to the body of knowledge in partnering by extending the understanding of project level partnering, and documenting effective practice found in the research to the program level. This will be achieved by answering the following overarching research question: Are there quantifiable benefits for implementing project level partnering practices that can be accrued by institutionalizing the principles of partnering at the program level?.;The research findings will also have practical implications for transportation agencies which will address that gaps in current knowledge through the following objectives: develop decision-making procedures to select projects to be delivered using partnering based on their project performance metrics; develop a framework procedure to measure the impact of partnering practices; developing guidance for partnering projects delivered using ACMs; and develop a partnering organizational maturity model to identify potential areas of improvements at program level.
机译:本论文旨在探讨合作伙伴作为交通运输公司采用的项目交付方法来改善公路建设项目绩效的决策工具。实施项目合作伙伴关系是为了应对通常由代表行业的对抗性关系引起的项目绩效问题。合作伙伴关系是一种通过提供开放式交流和共同解决问题的框架来改善关系的工具,目的是获得双赢的结果。尽管广泛使用合作伙伴关系,但文献综述并未揭示先前的研究量化了在较长时间内实施合作伙伴关系的成本和收益。以下三个问题是项目开发和交付过程中所有公共交通部门的首要关注事项:(1)选择适当的项目交付方式;(2)在最大程度地提高项目成本/时间确定性的同时,最大程度地减少因纠纷引起的干扰;(3)确保主动进行项目质量管理,同时为工人和出差公众创造安全的环境;替代项目交付方法的使用日益增加,导致上述问题变得越来越相互关联,并给州交通运输部(DOT)带来了项目管理挑战。这些项目不仅允许并发的设计和施工,而且它们以更快的速度运行,这需要更高程度的集成和主动协作才能满足激进进度的要求。合作伙伴关系最初是由亚利桑那州DOT于1996年实施的,被发现是一种有效的工具,可以为业主,其设计顾问和建筑承包商之间的诚实,信息丰富的交流创造必要的氛围。但是,美国国家公路和运输官员协会(AASHTO)合作手册仅在传统的低价项目交付基础上于1998年出版,因此不包括使用替代承包方法(ACM)交付的合作项目的指南。旨在通过扩展对项目级合作伙伴关系的理解,并将研究中发现的有效实践记录到计划级,为合作伙伴中的知识体系做出贡献。这将通过回答以下总体研究问题来实现:通过将计划一级的合作原则制度化,实施项目一级的合作实践是否会产生可量化的收益?;研究结果还将对运输机构产生实际影响。它将通过以下目标解决当前知识的空白:制定决策程序,根据项目绩效指标使用合作伙伴选择要交付的项目;制定衡量合作伙伴关系影响的框架程序;为使用ACM交付的合作项目制定指南;并建立合作的组织成熟度模型,以识别计划级别的潜在改进领域。

著录项

  • 作者单位

    Iowa State University.;

  • 授予单位 Iowa State University.;
  • 学科 Civil engineering.;Management.;Transportation.
  • 学位 Ph.D.
  • 年度 2017
  • 页码 148 p.
  • 总页数 148
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 11:38:27

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号