首页> 外文学位 >Information systems development project success and failure: An agency theory interpretation.
【24h】

Information systems development project success and failure: An agency theory interpretation.

机译:信息系统开发项目的成败:代理理论的解释。

获取原文
获取原文并翻译 | 示例

摘要

The failure rate of information systems (IS) development projects remains alarmingly high. Studies indicate that as few as 16% of IS projects are completed on time and within budget. Many factors have been identified as causes of project failure. One such cause is poor project management. Specifically, poor monitoring and control by the project manager and lack of incentives for developers may contribute to project failure.; Agency theory offers a potential explanation for project failure. Agency theory suggests that appropriate monitoring and control will increase the likelihood of project success. It further suggests that appropriate incentives will help. A survey instrument was developed using content analysis of notes taken during twelve structured interviews. The survey instrument was used to collect data from IS project managers. The survey data were analyzed for reliability and validity. The data were used to test eight hypotheses derived from agency theory, and related to IS project success. Regression analysis was used to test those hypotheses.; The study contributes to the understanding of information systems project management by showing that contract type, monitoring, goal conflict, moral hazard, adverse selection, and task programmability are multi-dimensional constructs. It further contributes by identifying their dimensions and providing an instrument for their measurement in future research. It validates an instrument for measuring project success. It provides support for expectations that more outcome-based contracts, more monitoring, less shirking, and less misrepresentation of privately held information lead to project success. Finally, it contributes by contradicting expectations that more goal conflict and more task programmability lead to more outcome-based contracts and that more outcome-based contracts lead to less monitoring. These findings should help IS project managers better manage projects.
机译:信息系统(IS)开发项目的失败率仍然很高。研究表明,只有不到16%的IS项目按时且在预算范围内完成。许多因素被确定为项目失败的原因。其中一个原因是项目管理不善。具体来说,项目经理的监视和控制不力以及对开发商的激励不足可能导致项目失败。代理理论为项目失败提供了潜在的解释。代理理论认为,适当的监控将增加项目成功的可能性。它进一步表明,适当的激励措施将有所帮助。通过对十二次结构化访谈中记录的笔记进行内容分析,开发了一种调查工具。调查工具用于从IS项目经理那里收集数据。分析调查数据的信度和效度。数据用于检验源自代理理论的八个假设,这些假设与IS项目的成功有关。回归分析被用来检验那些假设。通过显示合同类型,监视,目标冲突,道德风险,逆向选择和任务可编程性是多维构建,该研究有助于理解信息系统项目管理。通过确定尺寸并为将来的研究提供测量工具,它进一步做出了贡献。它验证了衡量项目成功的工具。它为以下期望提供支持:更多基于结果的合同,更多监视,更少回避和更少地歪曲私人拥有的信息可导致项目成功。最后,它与期望值相矛盾,即更多的目标冲突和更多的任务可编程性导致更多的基于结果的合同,而更多的基于结果的合同导致更少的监控。这些发现应有助于IS项目经理更好地管理项目。

著录项

  • 作者

    Mahaney, Robert C.;

  • 作者单位

    University of Kentucky.;

  • 授予单位 University of Kentucky.;
  • 学科 Business Administration Management.
  • 学位 Ph.D.
  • 年度 2000
  • 页码 278 p.
  • 总页数 278
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 贸易经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号