Estimating the effort costs of information technology disaster recovery projects: A model based on a mixed methodology investigation.

机译:估计信息技术灾难恢复项目的工作成本:基于混合方法调查的模型。

获取原文
获取原文并翻译 | 示例

摘要

Similar to the IT productivity paradox, return on IT disaster recovery investment (RODRI) has become a controversial topic due to the growing amount of business dependence upon its information infrastructure and its vulnerability to an unplanned interruption of normal business activity. Taking time to consider the cost of a business disaster is an important step forward to understanding the true costs associated with lost business or reputation risk. Estimating IT disaster recovery project effort cost has always been a sticky point for IT managers. However, it is clear that organizations need to understand the variables that define RODRI and to endure the discomfort of assigning dollar values to quantities that currently are ill-defined and not very well known. Assessing IT disaster recovery project size is an important step in cost estimation and project planning. Project sizing should be estimated first and is used to estimate the project effort. The effort estimate is used to estimate the schedule and total costs of a project. The quantitative sizing and effort cost estimation techniques for IT disaster recovery projects can have a direct impact on the success of project planning and implementation. The need for a reliable, consistent, and quantitative model to estimate sizing and effort cost for IT disaster recovery projects is evident. The results of this research will be the quantitative models to estimate the project sizing and effort cost of IT disaster recovery projects.
机译:与IT生产率悖论相似,由于业务对其信息基础结构的依赖性越来越高,并且易受正常业务活动的意外中断的影响,IT灾难恢复投资(RODRI)的回报已成为有争议的话题。花时间考虑业务灾难的成本是了解与业务损失或声誉风险相关的真实成本的重要一步。估计IT灾难恢复项目的工作成本一直是IT经理的难题。但是,很明显,组织需要了解定义RODRI的变量,并忍受将美元价值分配给当前定义不明确且不太为人所知的数量带来的不便。评估IT灾难恢复项目规模是成本估算和项目规划中的重要步骤。应该首先估计项目规模,然后将其用于估计项目工作量。估算工作量用于估算项目的进度和总成本。 IT灾难恢复项目的定量规模和工作成本估算技术可以直接影响项目计划和实施的成功。很明显,需要一种可靠,一致且定量的模型来估计IT灾难恢复项目的规模和工作成本。这项研究的结果将是量化模型,以估计IT灾难恢复项目的项目规模和工作成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号