A probabilistic assessment technique for shell-and-tube heat exchanger inspection.

机译:管壳式换热器检查的概率评估技术。

获取原文
获取原文并翻译 | 示例

摘要

Plow-induced vibration is a common phenomena in shell-and-tube heat exchangers. The resulting vibrations can lead to component failure by fretting wear or fatigue. The intent of thus research project is to develop a methodology that can be used at the design stage to give an overall estimate of service life and during component operation to monitor known flaws and ensure that they will not fail during operation.;The vibration response of a four-span tube subjected to turbulence and low-level Hurid-elastic forces was calculated for varions support conditions. It was determined that the clearance at the supports has a large effect out the critical flow velocity. As the clearance is increased, the critical flow velocity will increase. This is associated with an increase in the overall system damping. As the tube impacts the supports, energy is transferred into higher modes of vibration which dampen out more quickly. It is also shown that friction at the supports has no effect on the vibration response below the critical flow velocity.;An initial through-wall crack is assumed directly beside the tube sheet where the bending stress is highest. The crack propagates due to cyclical stress caused by vibration and is allowed to grow up to fracture. A series of Monte Carlo simulations were run where the clearance at the supports and the support friction were varied according to probability density functions. It is shown that the time-to-fracture for the crack is highly dependent the clearance of the loose support directly beside the tube sheet. As the clearance is increased the overall displacement and vibration amplitudes increase resulting in higher cyclical stresses. It is shown that a Weibull distribution can be fit reasonably well to the time-to-fracture data for the crack. Leak rate calculations are made on the crack as it grows toward fracture. This data shows how the leak rate changes with time depending an the input conditions and can he used to determine the maximum leakage before fracture. A Weibull distribution is also fit to leak rate data based on the time for the leak rate to reach 5 kg/day. This statistical data can then be used in an analysis to see if LBB criteria will apply.;Leak-before-break (LBB) is an analysis based on the assumption that there is negligible chance that a flaw will fail before a leak can be detected. As part of this project. leak rate calculation are made on growing flaws. This information can then be used when assessing whether LBB criteria will apply.
机译:犁激振动是管壳式换热器中的常见现象。产生的振动会因微动磨损或疲劳而导致组件故障。因此,该研究项目的目的是开发一种方法,该方法可在设计阶段使用,以对使用寿命和组件运行期间进行总体估计,以监控已知缺陷并确保它们在运行期间不会失效。计算了一个四跨管在湍流和低水平的Hurid弹力作用下的变形情况。已经确定,在支撑件处的间隙对临界流速有很大的影响。随着间隙增加,临界流速将增加。这与整个系统阻尼的增加有关。当管子撞击支撑件时,能量会传递到更高的振动模式,从而更快地衰减。还显示出,在临界流速以下时,支座处的摩擦对振动响应没有影响。假定在弯曲应力最高的管板旁边直接存在初始的贯穿壁裂纹。裂纹是由于振动引起的周期性应力而传播的,并逐渐长大并破裂。进行了一系列的蒙特卡洛模拟,其中,根据概率密度函数,改变了支撑间隙和支撑摩擦。结果表明,裂纹的破裂时间在很大程度上取决于在管板旁边的松散支撑的间隙。随着间隙增加,整体位移和振动幅度增加,从而导致更高的循环应力。结果表明,Weibull分布可以很好地拟合裂缝的断裂时间数据。当裂缝向裂缝扩展​​时,对裂缝进行泄漏率计算。该数据显示泄漏率如何随输入条件的变化而变化,并可用于确定断裂前的最大泄漏量。威布尔分布也适合于基于泄漏率达到5 kg /天的时间的泄漏率数据。然后可以将该统计数据用于分析中,以查看是否适用LBB标准。断前泄漏(LBB)是基于以下假设进行的分析:在检测到泄漏之前缺陷发生故障的可能性极小。作为该项目的一部分。泄漏率是根据不断增长的缺陷进行计算的。然后,可以在评估LBB标准是否适用时使用此信息。

著录项

  • 作者

    Vincent, Brady T.;

  • 作者单位

    University of New Brunswick (Canada).;

  • 授予单位 University of New Brunswick (Canada).;
  • 学科 Engineering Mechanical.
  • 学位 M.Sc.
  • 年度 2007
  • 页码 141 p.
  • 总页数 141
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 11:39:09

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号