封面
声明
FOREWORDS
英文摘要
中文摘要
目录
CHAPTER ONE INTRODUCTION
1.1 Research Justification
CHAPTER TWO LITERATURE REVIEW
2.1 Preamble
2.2 Introduction
2.3 Definitions
2.4 Risk Analysis techniques and shortcomings
2.5 International construction project risk management
2.6 Summary
CHAPTER THREE RESEARCH DESIGN
4.1 Introduction
4.2 Questionnaire Design
4.3 Case Studies design
4.4 Research design phases
4.5 Research Findings
4.6 Conclusions
CHAPTER FOUR METHODOLOGY AND PROCESS OF THE RESEARCH
4.1 Introduction
4.2 Research Strategy
4.3 Research Procedure
4.4 Research Steps
4.5 Ethical consideration
4.6 Conclusion
CHAPTER FIVE CASE STUDIES AND MODEL EVALUATION
5.1 Introduction
5.2 Case Study 1: Assessing the Riskiness of Construction Experiment Project
5.3 Case Study 2: Risk assessment of an office building construction project.
5.4 Case Studies results and evaluation
5.5 Summary
CHAPTER SIX CONCLUSION
6.1 Discussion
6.2 Research Findings
6.3 Research Limitation
6.4 Future Research
6.5 Framework for the Implementation of BIM and P6 scheduling models in the SA-ICPM process
6.6 Concluding remarks
参考文献
LIST OF FIGURES
LIST OF TABLES
致谢
天津大学;