首页> 中文学位 >Problems of Transboundary Waters between Lesotho and South Africa in the Implementation of the Lesotho Highlands Water Project
【6h】

Problems of Transboundary Waters between Lesotho and South Africa in the Implementation of the Lesotho Highlands Water Project

代理获取

目录

声明

摘要

Abstract

Table of Contents

1.Introduction

1.1 Historical Background

1.2 Problem Statement

1.3 Rationale for Research

1.4 Research Methodology

1.5 Contribution to Current Knowledge

1.6 Limitations of the Research

2.Literature Review

3.Evolution of the Project

3.1 Stakeholders and Interest groups

3.2 The Legal Framework

3.3 Implementation and Problems

3.4 Problems with the Treaty

3.5 Failures/points of Conflict(Emerging Problems)

4.Case Study Findings

4.1 Engineering and Infrastructure Problems

4.2 Political Problems

4.3 Security Problems

4.4 Socio-Economic Problems

5.Conclusion and Recommendations

Bibliography

展开▼

摘要

本研究探讨了南非与莱索托两国在实施“莱索托高地水利项目”(LHWP)过程中所面临的挑战。同时指出,尽管挑战不小,超越冲突,开展协作,将大有裨益。南非是个区域性大国,但由于水资源匮乏,从而与高山上的小王国莱索托构成了依存关系。本文深入分析和探讨了项目实施过程中政府换届和政策变迁所造成的挑战,并提出对策建议以确保其顺利完工。即是,项目的挑战可以被克服,却不能导致项目终止。其中,最主要的挑战是控制门的位置定在哪里,以防莱索托单方面暂停水流。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号