声明
Abstract
Contents
Introduction
1.BASIC INFORMATION
1.2 The main provisions of the theory of orientation of underground workings
1.3 Methods of tunnel construction and precision requirements
1.4 Basic concepts of orientation via method of triangle connection
1.5 Basic concepts of cross slit of counter workings.Breakdown of underground workings
1.6 Engineering and geological surveys for the construction of tunnels
1.7 Requirements for the performance of work
2.ORIENTING OF AN UNDERGROUND GEODESIC BASE VIA THE METHOD OF TRIANGLE CONNCTlON
2.1 Basics of the orientation the method of connecting triangles
2.2 Monitoring of measurement results
2.3 Equalizing the connecting triangles
2.4 Calculation of the direction angle of the line,orientation of underground polygonometry
2.5 Calculation of the mean square error of orientation
2.6 Evaluation and analysis of the performed calculations
3.JUSTIFICATION OF CROSS SLIT SCHEME AND DEFDINING ACCEPTABLE DISCREPANCIES OF FACES DURING THE CONSTRUCTION OF SUBWAY TUNNELS
3.1 General provisions
3.2 Analysis of the sources of errors of the cross-connection of counter-heading connections
3.3.The estimated error of the fault in the plan(along the X axis)
3.4 The height error for the expected height error(Z-axis)
3.5 Evaluation and analysis of the performed calculations
4.ANALYSIS OF THE CONDUCTED WORKS AND THE JUSTIFICATION OF THE APPLIED METHODOLOGY
4.2 Analysis of the application of triangle connection method
4.3 Analysis of the cross connection discrepancy of counter-heading connections when applying the geodetic base orientation via method of triangle connection
Conclusion
Acknowledgement
References