首页> 外文会议>WSC'12;Winter Simulation Conference >Using iterative simulation to incorporate load-dependent lead times in master planning heuristics
【24h】

Using iterative simulation to incorporate load-dependent lead times in master planning heuristics

机译:使用迭代模拟将依赖于负载的交货时间纳入总体规划启发式方法

获取原文

摘要

In this paper, we consider heuristics for master planning in semiconductor manufacturing. While lead times are typically assumed as fixed in production planning, we use iterative simulation to take load-dependent lead times into account. An AutoSched AP simulation model of a semiconductor supply chain is used for implementing the scheme. Simulation results show that the iterative scheme converges fast and leads to less variable, more profitable production plans compared to planes obtained by the fixed lead time approach.
机译:在本文中,我们将启发式方法用于半导体制造的总体规划。尽管通常在生产计划中假设交付周期是固定的,但我们使用迭代模拟来考虑与负载相关的交付周期。半导体供应链的AutoSched AP仿真模型用于实施该方案。仿真结果表明,与通过固定提前期方法获得的飞机相比,该迭代方案收敛速度快,并且导致可变性较小,利润更高的生产计划。

著录项

  • 来源
  • 会议地点 Berlin(DE);Berlin(DE)
  • 作者单位

    Supply Chain Management Am Campeon 1-12 Infineon Technologies AG Neubiberg 85579 Germany;

  • 会议组织
  • 原文格式 PDF
  • 正文语种
  • 中图分类
  • 关键词

  • 入库时间 2022-08-26 14:38:56

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号