Construction of a combined Stormwater Management and Road Tunnel in Kuala Lumpur, Malaysia

机译:在马来西亚吉隆坡建设雨水管理与公路隧道的结合体

获取原文
获取原文并翻译 | 示例

摘要

The Project SMART (Stormwater Management and Road Tunnel) in Malaysia includes among othersrnthe construction of a 9.7 km long TBM-driven tunnel with a bored diameter of 13.21 m. The tunnelrnserves dual purposes: firstly, it will avoid floods in the city center, which occur frequently during rainyrnperiods; secondly, the central section of the structure will serve as a road tunnel. Only in cases ofrnheavy rain, the different road decks will be closed. An innovative idea that will be realized for the firstrntime worldwide. The challenges of this project consist of the large tunnel diameter in combinationrnwith small radii of curves of min. 250 m along the alignment. In addition, the tunnel has to bernconstructed under severe geotechnical conditions within the city center of Kuala Lumpur. The lecturernwill deal with the northern section in general and the problems encountered to date during tunneling.
机译:马来西亚的SMART项目(雨水管理和公路隧道)包括建设9.7公里长的TBM掘进隧道,钻孔直径为13.21 m。该隧道具有双重目的:首先,它将避免在雨季期间经常发生的市中心洪水。其次,结构的中央部分将用作公路隧道。仅在大雨的情况下,才会关闭不同的路面板。一个创新的想法将在全球范围内首次实现。该项目面临的挑战包括大的隧道直径和最小的最小曲线半径。沿路线250 m。此外,必须在吉隆坡市中心严重的岩土条件下对隧道进行拆除。该讲座将主要讨论北部地区以及迄今为止在隧道施工中遇到的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号