Estimation of Groundwater Discharged into a Tunnel

机译:估算流入隧道的地下水

获取原文
获取原文并翻译 | 示例

摘要

The quantity of groundwater discharged into a tunnel planned for a future KTX line was estimated byrnmeans of an empirical formula and by the help of numerical modelling. The amount of water rechargernin the studied area was calculated based on the analysis of data related to groundwater level variationrnand with an empirical equation governing groundwater recharge rate. Quantity of groundwaterrndischarged into the 10km long tunnel varied from 228,000 to 353,000m3/day when the empiricalrnformula is used for the estimation. Using numerical modelling, the estimated quantity was found to bernbetween 14,148 and 99,200m3/day considering reduction of hydraulic conductivity based on tunnelrnlining.
机译:通过经验公式的平均值并借助数值模拟来估算计划用于未来KTX线的隧道中排放的地下水量。在对与地下水位变化有关的数据进行分析的基础上,通过计算地下水补给率的经验公式,计算出研究区的补给水量。当使用经验公式进行估算时,排入10公里长隧道的地下水量从228,000立方米/天至353,000m3 /天。使用数值模型,考虑到基于隧道衬砌的水力传导率降低,估计数量介于14148至99200m3 /天之间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号