【24h】

The Evolution of a Software Measurement Program

机译:软件评估程序的演变

获取原文
获取原文并翻译 | 示例

摘要

An engineering organization needs measurements. Competitive pressures demand a quantitative understanding of the contributors to project cost and schedule, such as process productivity and product quality (which drives rework). The integration of measurement and analysis activities into project processes supports: 1. Objective planning and estimating; 2. Tracking actual performance against established plans and objectives; 3. Identifying and resolving process-related issues; 4. Providing a basis for incorporating measurement into additional processes in the future. This paper discusses practical lessons learned from establishing and evolving such a measurement system, emphasizing the use of centralized metrics. It addresses requirements and design of a centralized repository, as well as cultural issues arising from its use over time.
机译:工程组织需要测量。竞争压力要求对项目成本和进度的贡献者有定量的了解,例如过程生产率和产品质量(这会推动返工)。将测量和分析活动整合到项目流程中可支持:1.客观的计划和估算; 2.根据既定的计划和目标跟踪实际绩效; 3.查明和解决与过程有关的问题; 4.为将来将度量合并到其他过程中提供基础。本文讨论了从建立和发展这样的测量系统中学到的实践经验,强调了集中式度量的使用。它解决了中央存储库的要求和设计,以及随着时间的推移而产生的文化问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号