The connection number a+bi+cj, a new kind of number introduced in Set Pair Analysis (SPA) theory, was used in uncertain network planning methodology to represent the uncertainty and delay of working procedure time, it is caused by random, fuzzy, indeterminate-known or unforeseen factors and unexpected incident in a project. By introducing the concepts of primary critical paths, secondary critical paths and third critical paths and classifying method of critical paths in uncertainty environment, we constructed a new uncertainty network planning method that is different from the traditional one and more consistent with the practice application, because the new one can obtain three different sets of critical paths instead of only one critical path obtained by traditional. The illustrating examples given in this paper indicate that the new method can provide more useful information for the finish time forecasting and controlling of a project.
机译:集对分析(SPA)理论中引入的一种新的连接数a + bi + cj,用于不确定性网络规划方法中,表示工作流程时间的不确定性和延迟,它是由随机,模糊,项目中未知或不可预知的不确定因素以及突发事件。通过引入不确定性环境下的主要关键路径,次要关键路径和第三关键路径的概念以及关键路径的分类方法,我们构造了一种不同于传统的不确定性网络规划方法,并且与实际应用更加一致,因为新的方法可以获得三组不同的关键路径,而不是传统方法获得的仅一组关键路径。本文给出的说明性示例表明,该新方法可以为项目的完成时间预测和控制提供更多有用的信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号