首页> 外文会议>Intelligent Control and Automation, 2004. WCICA 2004. Fifth World Congress on >Uncertainty network planning methodology based on the connection number a+bi+cj
【24h】

Uncertainty network planning methodology based on the connection number a+bi+cj

机译:基于连接数a + bi + cj的不确定性网络规划方法

获取原文

摘要

The connection number a+bi+cj, a new kind of number introduced in set pair analysis (SPA) theory, was used in uncertain network planning methodology to represent the uncertainty and delay of working procedure time. It is caused by random, fuzzy, indeterminate-known or unforeseen factors and unexpected incident in a project. The concepts of primary critical paths, secondary critical paths and third critical paths with the classifying method of critical paths in uncertainty environment were introduced. A new uncertainty network planning method is constructed, which is different from the traditional concept and more consistent with the practical application. The new concept can obtain three different sets of critical paths instead of only one critical path obtained by traditional one. The illustrating examples given in this paper indicate that the new method can provide more useful information for the finish time forecasting and controlling of a project.
机译:集对分析(SPA)理论中引入的一种新的连接数a + bi + cj被用于不确定性网络规划方法中,以表示不确定性和工作流程时间的延迟。它是由随机的,模糊的,不确定的未知或不可预见的因素以及项目中的意外事件引起的。介绍了不确定环境下关键路径的分类方法,主要关键路径,次要关键路径和第三关键路径的概念。构造了一种新的不确定性网络规划方法,该方法不同于传统的概念,更符合实际应用。新概念可以获取三组不同的关键路径,而不是传统方法中仅获得的一条关键路径。本文给出的说明性示例表明,该新方法可以为项目的完成时间预测和控制提供更多有用的信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号