Quality Control of Baiyun Concrete Face Rockfill Dam

机译:白云混凝土面板堆石坝质量控制

获取原文

摘要

1 General RemarksBaiyun water resources and hydroelectric project locates in Buchen County, Hunan province, inthe upriver gorge of the Wu River, 5 kilometers from Buchen city. The project is composed ofdam, flood discharge tunnel, hydropower tunnel, powerhouse, switching station and so on, andthe installed capacity is 3×18MW. The height of the concrete face rock-fill dam is 120m, the damcrest EL. is 550m, and the length of the dam axial is 198.8m. The dam foundation is sandstoneand the upriver and the downriver slope of the dam is 1:1.4, and the embankment capacity of thedam is 1587000m3, excluding 78000m3 blanket clay.
机译:1概述白云水利水电项目位于湖南省布痕县,地处乌江上游,距布痕市5公里。该项目由大坝,泄洪隧洞,水电隧洞,电站,变电站等组成,装机容量为3×18MW。混凝土面板堆石坝的高度为120m,即坝顶EL。是550m,坝的轴向长度是198.8m。大坝基础是砂岩,大坝的上,下坡坡比为1:1.4,大坝的堤坝容量为1587000m3,其中不包括7.8万立方米的黏土。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号