首页> 外文会议>WM '99 conference >RANCHO SECO SECONDARY SYSTEM DISMANTLEMENT
【24h】

RANCHO SECO SECONDARY SYSTEM DISMANTLEMENT

机译:RANCHO SECO二次系统拆除

获取原文

摘要

The Rancho Seco Nuclear Generating Station ceased operation in June of 1989 and entered anextended period of SAFSTOR. Dismantlement of Turbine Building systems began in 1997 andis nearing completion. Approval for dismantlement was based on savings that could be realizedover the decommissioning cost estimate. Financial success has been achieved through anaggressive decontamination and survey-for-release program. High packaging efficiency hasbeen achieved for the waste sent for disposal. Hazardous materials have been a major issue.This paper describes the problems encountered and solutions found in that effort.
机译:兰乔山高核电站于1989年6月停止运行,进入SAFSTOR的延长期。涡轮机建筑系统的拆除始于1997年,现已接近完成。拆卸批准是基于可在退役成本估算上实现的节省。通过积极的去污和释放调查计划已经取得了财务上的成功。对于已处置的废物,已经实现了高包装效率。有害物质一直是主要问题。本文介绍了在此过程中遇到的问题和找到的解决方案。

著录项

  • 来源
    《WM '99 conference》|1999年|p.1-5|共5页
  • 会议地点 Tucson, AZ(US)
  • 作者单位

    Incremental Decommissioning Manager SMUD;

    CHP NewRad Inc. GTS/Duratek;

    Vice President J.A.Jones Construction Services;

  • 会议组织
  • 原文格式 PDF
  • 正文语种
  • 中图分类
  • 关键词

  • 入库时间 2022-08-26 14:37:12

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号