首页> 外文会议>WEFTEC 2001;Annual conference exposition of Water Environment Federation >DESIGN OF ONE BILLION GALLON PER DAY FINE SCREEN FACILITIES FORTHE ADVANCED WASTEWATER TREATMENT PLANTAT BLUE PLAINS
【24h】

DESIGN OF ONE BILLION GALLON PER DAY FINE SCREEN FACILITIES FORTHE ADVANCED WASTEWATER TREATMENT PLANTAT BLUE PLAINS

机译:蓝场高级污水处理厂每天10亿加仑的精细屏幕设计

获取原文
获取原文并翻译 | 示例

摘要

The District of Columbia Water and Sewer Authority's Advanced Wastewater Treatment Plant atrnBlue Plains, with a design average daily flow of 370 million gallon per day (mgd), and designrnpeak flow of 1,076 mgd, currently utilizes coarse back clean/back return bar screens to screen therninfluent combined wastewater entering its two screening facilities. As part of an upgrade to thernplant’s headworks, the screening facilities will be retrofitted with 6-mm fine screens, screeningsrnconveyance systems and two screenings loading stations. The screenings facilities upgrades willrnbe constructed concurrently with upgrades to other major plant processes and installation of arnplant-wide computer control system. This paper presents the design features that werernincorporated to increase the reliability of the screenings removal process while minimizingrnmaintenance requirements. Additional design features integrated to overcome the constraints ofrnconstructing within existing facilities that must be maintained in continuous operation, duringrnseveral concurrent plant-wide upgrades, are also presented.
机译:哥伦比亚特区水和污水处理局的高级废水处理厂位于Blue Plains,设计平均日流量为3.7亿加仑/日,设计峰值流量为1,076 mgd,目前使用的是粗背清洁/回水筛网。流入的废水合并进入其两个筛选设施。作为对工厂的升级的一部分,筛分设备将进行改造,配备6毫米细筛,筛分输送系统和两个筛分装载站。筛选设施的升级将与其他主要工厂工艺的升级以及在工厂范围内的计算机控制系统的安装同时进行。本文介绍了合并的设计功能,以提高筛分清除过程的可靠性,同时最大程度地减少维护需求。还介绍了集成的其他设计功能,以克服现有设施内必须连续运行,在工厂范围内同时进行的多次升级中必须维护的构造限制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号