首页> 外文会议>Web information systems and mining >Risk Assessment Method of Radio Block Center in Fuzzy Uncertain Environment
【24h】

Risk Assessment Method of Radio Block Center in Fuzzy Uncertain Environment

机译:模糊不确定环境下无线电块中心的风险评估方法

获取原文
获取原文并翻译 | 示例

摘要

In this paper, a risk assessment method of radio block center (RBC) for train control based on fuzzy multi-criteria decision-making theory is proposed. By a thorough study of the system risk assessment problem of RBC including Fault Mode and Effects Analysis (FMEA) in fuzzy uncertain environment, in the proposed method, 4 indices including occurrence possibility, severity, detectability and maintainability are chosen for risk assessment and then fuzzificated by triangular fuzzy number, their weights are calibrated respectively to show their relative importance by information entropy weight method; and the final risk assessment result is acquired by sorting the fault mode employing the fuzzy multi-criteria decision-making theory. An application case is studied in this paper to verify the effectiveness and feasibility of the proposed method, and the assessment process and result indicates its convenience for application and its suitableness for popularization.
机译:提出了一种基于模糊多准则决策理论的列车控制无线电块中心风险评估方法。通过对模糊不确定环境下红细胞的系统风险评估问题,包括故障模式和影响分析(FMEA)进行深入研究,在该方法中,选择了发生可能性,严重性,可检测性和可维护性四个指标进行风险评估,然后对其进行模糊化处理。通过三角模糊数,分别用信息熵权法对它们的权重进行校正,以表明它们的相对重要性。利用模糊多准则决策理论对故障模式进行排序,得到最终的风险评估结果。本文以一个应用案例为例,验证了该方法的有效性和可行性,评估过程和结果表明了该方法的适用性和推广性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号