Never, Never, Never Give Up: A Case Study Of How Pamlico County Communities Worked For More Than A Decade, And Acquired 10 Funding Instruments, To Build Their Project

机译:永无止境,永不放弃:帕姆利科县社区如何工作超过十年并获得10个资助工具来建立项目的案例研究

获取原文

摘要

In 1987, Pamlico County’s on-site systems were failing. At the County’s request, McKim &Creed provided costs for complete countywide collection and treatment systems. Due tostaggering costs, the issue went dormant.However, as time went on, towns and sewer districts within the County began experiencingproblems, or faced the need to expand. Funds were available for these improvements, buteveryone recognized that financing short-term solutions made the inevitable long-term solutionsharder to attain.For two years, McKim & Creed and all affected parties---which included Pamlico County, theTown of Oriental, and the Bay River Metropolitan Sewer District, which represented sevenmunicipalities---met with funding agencies, regulatory agencies, and legislators to determine thebest solution to the area’s long-term wastewater needs. These discussions resulted in theobtainment of one federal revolving loan, two state revolving loans, three high unit cost grants,and supplemental local funds to finance a regional project. This project, when completed, wouldeliminate both surface water discharges in favor of a regional non-discharge irrigation system.These loans and grants represented a significant amount of capital, but projections for the firstyears after completion indicated extremely tight cash flow. The participants decided that the rateincreases required to balance cash flow immediately after project completion were too severe foran already burdened constituency. However, if the entities instituted minor rate increasesimmediately and developed a sinking fund, the first few years of negative operating revenuecould be drawn from this fund. By the time the sinking fund was exhausted, the user base wouldhave expanded sufficiently to be self-sustaining, without extraordinary rate increases. The fundwas established.When the project was released for bids, the economy in the state was booming, and constructionactivity was plentiful. The project was bid approximately $850,000 over budget. However,participants’ commitment to the project was strong. The health of the Neuse River Basin wasreceiving national attention, and removal of nutrients from the river and sound became aprominent political issue. Because of its association with the river, this project received fundingfrom the Lower Neuse Basin Association and the Clean Water Management Trust Fund, whichaccommodated the higher construction cost. The budget was revised to $6.2 million. Finalconstruction cost was $5.9 million, and construction was completed in June 1999.
机译:1987年,帕姆利科县的现场系统出现故障。应县的要求,McKim&Creed提供了整个县范围内完整的收集和处理系统的费用。由于惊人的成本,这个问题一直处于休眠状态,但是随着时间的流逝,该县的城镇和下水道区开始遇到问题,或者面临扩大的需要。已有资金用于这些改进,但每个人都认识到短期解决方案的融资使难免的长期解决方案难以实现。两年来,麦金与克里德(McKim&Creed)以及所有受影响的方-包括东方小镇帕姆利科(Pamlico County)和代表七个市镇的Bay River Metropolitan Sewer District,与供资机构,监管机构和立法机构合影,以确定该地区长期废水需求的最佳解决方案。通过这些讨论,获得了一笔联邦循环贷款,两笔州循环贷款,三笔高单位成本赠款,以及补充地方资金以资助一个地区项目。该项目完成后,将消除两个地表水排放,有利于区域性非排放灌溉系统。这些贷款和赠款占了相当大的资本,但对完成后第一年的预测表明现金流量非常紧张。参与者认为,对于已经负担沉重的选民而言,在项目完成后立即平衡现金流量所需的利率上升幅度太大。但是,如果这些实体立即提高了小幅利率并开发了一个沉没基金,则可以从这笔基金中提取前几年的负营业收入。到了沉没资金用尽时,用户群将已经足够扩展以实现自我维持,而不会出现特别的费率增长。成立了该基金。当该项目发布招标时,该州的经济蓬勃发展,建筑活动十分丰富。该项目的出价超出预算约85万美元。但是,参与者对该项目的承诺很高。尼兹河流域的健康问题引起了全国的关注,从河流和声音中去除养分成为一个突出的政治问题。由于该项目与河流的联系,该项目获得了下Neuse流域协会和清洁水管理信托基金的资助,以适应较高的建设成本。预算修订为620万美元。最后的建筑费用为590万美元,工程于1999年6月完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号