首页> 外文会议>Utility Management Conference Proceedings 2012 : Managing in the New Normal >Strategizing for the Future using Advanced Asset Management to Plan for Impacts of Aging Infrastructure
【24h】

Strategizing for the Future using Advanced Asset Management to Plan for Impacts of Aging Infrastructure

机译:使用高级资产管理对未来进行战略规划,以计划老化基础架构的影响

获取原文
获取原文并翻译 | 示例

摘要

Broad Creek Basin is one of twenty-four sewered drainage basins within the WashingtonrnSuburban Sanitary Commission (WSSC) and is located in Prince George’s County, Maryland.rnThe Basin conveys untreated wastewater to the Broad Creek Wastewater Pumping Stationrn(WWPS). From there, wastewater is delivered to the Piscataway Wastewater Treatment Plant.rnBroad Creek Basin is currently operating under requirements set forth by the Consent Decreernfrom the Maryland Department of Environment (MDE) and the United States EnvironmentalrnProtection Agency (USEPA) to address high flow caused by rainfall derived inflow andrninfiltration (RDII) and groundwater infiltration (GWI). Accordingly, Broad Creek Basin is arnpriority basin for WSSC making it an ideal candidate for asset management planning. An assetrnmanagement plan (AMP) has been developed for Broad Creek Basin and WSSC has recentlyrnbegun implementation of its recommendations. Development of the AMP required significantrninvolvement from WSSC staff and provides recommendations to improve both the physicalrninfrastructure of the basin, enhanced operations and maintenance, recommendations for thernpersonnel and business processes to help implement the infrastructure improvements. This paperrndiscusses the development process of the AMP and the value it has provided to Broad CreekrnBasin and WSSC organization.
机译:Broad Creek盆地是位于华盛顿市郊区卫生委员会(WSSC)内的24个下水道排水盆地之一,位于马里兰州乔治王子县。该盆地将未经处理的废水输送至Broad Creek污水泵站(WWPS)。从那里将废水输送到Piscataway废水处理厂。布鲁克河流域目前正在根据马里兰州环境部(MDE)和美国环境保护局(USEPA)的同意书Decreern提出的要求进行操作,以解决由降雨引起的入渗和入渗(RDII)和地下水入渗(GWI)。因此,宽溪盆地是WSSC的优先盆地,使其成为资产管理计划的理想人选。已经为Broad Creek盆地制定了资产管理计划(AMP),WSSC最近开始实施其建议。 AMP的开发需要WSSC工作人员的大力参与,并提供建议以改善流域的物理基础设施,加强运营和维护,为人员和业务流程提供建议以帮助实施基础设施改进。本文讨论了AMP的开发过程及其为Broad CreekrnBasin和WSSC组织提供的价值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号