Comparison of Different Excavation Sequences for Unsymmetrical Large-span Arcade Tunnel

机译:非对称大跨度拱廊隧道不同开挖顺序的比较

获取原文
获取原文并翻译 | 示例

摘要

With Mai Zhai Ding Tunnel project as background, different excavation sequences of large-spanrnunsymmetrical arcade tunnel are simulated with Finite Element Method (FEM). In this paper, therndeformation and mechanic state variation of surrounding rock and lining, as well as the unsymmetricalrneffect due to the asymmetry of the tunnel, are studied. To verify the computational results, they arerncompared with the measured data.
机译:以麦寨顶隧道工程为背景,采用有限元法模拟了大跨度非对称拱廊隧道的不同开挖顺序。本文研究了围岩和衬砌的变形和力学状态变化,以及由于隧道的不对称性引起的非对称效应。为了验证计算结果,将它们与测量数据进行了比较。

著录项

  • 来源
  • 会议地点 Singapore(SG);Singapore(SG);Singapore(SG)
  • 作者单位

    Department of Geotechnical Engineering, Tongji University, Shanghai, China, 200092;

    Department of Geotechnical Engineering, Tongji University, Shanghai, China, 200092;

    Department of Geotechnical Engineering, Tongji University, Shanghai, China, 200092;

    Department of Geotechnical Engineering, Tongji University, Shanghai, China, 200092;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 各种隧道;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号