Dublin Port Tunnel -Excavation of an 11.8m Diameter Urban Motorway Tunnel

机译:都柏林港口隧道-开挖直径11.8m的城市高速公路隧道

获取原文
获取原文并翻译 | 示例

摘要

Every year more than 2,000,000 heavy vehicles pass through Dublin Port. These vehicles contribute tornserious traffic congestion in the city centre of Dublin. The Dublin Port Tunnel has been planned tornconnect Dublin Port to the M1 Motorway and thereby remove 9,000 heavy vehicles a day from therncity centre. The twin tube road tunnel is approximately 4.5 km long with each tube having 2 lanes ofrncarriageway and a walkway for emergency exit and maintenance. Approximately 2.6 km of the totalrntunnel length of 4.5 km is being constructed by bored tunnelling whilst the remainder is being built byrncut & cover methods. The NMI Consortium was awarded the design and build contract in Decemberrn2000. The consortium consists of Nishimatsu, Mowlem (UK) and Irishenco (Ir.). Nishimatsu arernresponsible for the design and construction of all the civil works related to the bored tunnels andrndecided to use two different 11.8 m diameter TBMs mainly due to the differences in ground conditions.rnOne TBM for hard rock will excavate about 86% of the bored tunnel section in hard limestone andrnbelow densely populated housing areas. The second machine is an Open-Face TBM equipped with 2rnintermediate decks and 3 excavator arms for its 660 m drive in boulder clay. Both tunnels are linedrnwith a structural concrete segmental primary lining and an insitu concrete secondary lining thatrnprovides fire protection and a smooth finish.
机译:每年有超过200万辆重型车辆通过都柏林港口。这些车辆加剧了都柏林市中心的交通拥堵。都柏林港口隧道已计划将都柏林港口连接至M1高速公路,从而每天从城市中心卸下9,000辆重型车辆。双管公路隧道长约4.5公里,每条管都有2条车道和一条用于紧急出口和维修的人行道。 4.5公里的总隧道长度中,约有2.6公里是通过钻孔隧道施工的,其余部分则是通过切口和覆盖法建造的。 NMI联盟于2000年12月获得设计和建造合同。该财团由Nishimatsu,Mowlem(英国)和Irishenco(爱尔兰)组成。西松公司负责与钻孔隧道有关的所有土建工程的设计和施工,主要是由于地面条件的不同,决定使用两种直径为11.8 m的TBM,这主要是由于地面条件的差异.rn一个硬岩TBM将开挖约86%的钻孔隧道断面在坚硬的石灰岩中,并在人口稠密的房屋区域以下。第二台机器是Open-Face TBM,配有2个中间甲板和3个挖掘机臂,用于660 m的巨石粘土驱动。两条隧道均衬有结构混凝土分段一级衬砌和现浇混凝土二级衬砌,从而提供了防火保护和光洁度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号