首页> 外文会议>Third International Symposium on Nondestructive Testing of Pavements and Backcalculation of Moduli, Jun 30-Jul 1, 1999, Seattle, Washington >The Israeli Experience with the Regular and Extended Dynamic Cone Penetrometer for Pavement and Subsoil-Strength Evaluation
【24h】

The Israeli Experience with the Regular and Extended Dynamic Cone Penetrometer for Pavement and Subsoil-Strength Evaluation

机译:以色列使用常规和扩展动态圆锥渗透仪进行路面和底土强度评估的经验

获取原文
获取原文并翻译 | 示例

摘要

One of the Israeli modification in the dynamic cone penetrometer (DCP) apparatus is the extension of the length of the standard penetrating rod to a total of about 2.0 meters by screwing on an additional 1.0-meter rod after the original rod has completely penetrated the pavement or subgrade. Such a procedure is required when the strength profile is significant at depths exceeding 1.0 meter or when the total thickness of the pavement layers, including the relevant subgrade layers, exceeds the length of the standard penetrating rod. Through comparative in-situ testing, it was found that a 20% deduction should be applied for this testing procedure to the CBR values calculated from the in-situ DCP results, both for clayey and for granular subsoils, when the standard CBR-DCP equation is used. Similarly, a 10% reduction should be applied to the 1.5-meter penetration rod results. These findings were also qualitatively verified by examining the change in the dynamic efficiency factor for the two penetrating rods. Additionally, a corrective equation is suggested when the penetration is not performed vertically in order to isolate the skin friction that develops along the penetrating rod and that has significant effects on the DCP values. Finally, the standard CBR-DCP relationship is validated again for both CH and CL clays, thus eliminating the need for specific additional relationships for these materials.
机译:以色列对动态锥形渗透仪(DCP)进行的一项改进是,在原始探杆完全穿透人行道后,通过拧上另外的1.0米探杆,将标准探杆的长度延长至总计约2.0米。或路基。当深度超过1.0米时强度分布很明显,或者包括相关路基层在内的路面总厚度超过标准穿透杆的长度时,就需要执行此步骤。通过比较原位测试,发现对于标准的CBR-DCP方程,对于黏土和颗粒状地基,从现场DCP结果计算出的CBR值应适用于该测试程序的20%扣除额用来。同样,对1.5米的穿透棒结果应减少10%。通过检查两个穿透棒的动态效率因子的变化,也对这些发现进行了定性验证。此外,当不垂直进行穿刺时,建议使用一个校正方程式,以隔离沿穿透杆产生的,对DCP值有重大影响的皮肤摩擦。最后,再次针对CH和CL粘土验证了标准CBR-DCP关系,从而消除了对这些材料的特定附加关系的需要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号