首页> 外文会议>Tailings and Mine Waste Conference; 20041010-13; Vail,CO(US) >A compendium of radon data for the rehabilitation of Australian uranium projects
【24h】

A compendium of radon data for the rehabilitation of Australian uranium projects

机译:ra数据汇编,用于澳大利亚铀项目的修复

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The release of radon gas and radon progeny from uranium projects is a major issue during operation as well as for the design of rehabilitation works. In Australia, there have been a number of pre-mining radon flux studies as part of the environmental investigation and potential development of recent uranium projects. There is also an increasing amount of operational data on radon fluxes and loads from various aspects of projects, such as tailings, waste rock and mills. Thus there exists much useful measured data which can be used to assess the design radon flux and load targets for rehabilitation. The main projects for which radon data exists includes Ranger, Olympic Dam, Beverley, Honeymoon, Jabiluka, Yeelirrie, Lake Way, Koongarra, Moline, Coronation Hill, Rockhole, Nabarlek, Rum Jungle, Port Pirie and Ben Lomond. To date, much of this data has not been thoroughly evaluated. The need to compile and assess this data is twofold. Firstly, to assess the loads released from uranium production as an input into life-cycle analyses of the nuclear fuel cycle, such as those undertaken by UNSCEAR and industry groups. Secondly, there is a need to set suitable design standards for radon flux for the rehabilitation of former and current uranium projects. This paper will present such a detailed compilation of radon fluxes and loads which can then be used as the basis for both life-cycle analyses as well as setting appropriate site-specific rehabilitation criteria for radon. The implications for former and current projects is then discussed as well as future data needs.
机译:铀项目中的gas气和ra子的释放是运营以及修复工程设计中的主要问题。在澳大利亚,已经进行了许多采矿前的flux气通量研究,这是环境调查和近期铀矿项目潜在开发的一部分。来自项目各个方面(例如尾矿,waste石和磨坊)的ra通量和负荷的运行数据也越来越多。因此,存在许多有用的测量数据,可用于评估设计的rehabilitation气通量和修复的负荷目标。存在ra气数据的主要项目包括游侠,奥林匹克大坝,贝弗利,蜜月,Jabiluka,Yeeirrie,Lake Way,Koongarra,Moline,Coronation Hill,Rockhole,Naballek,Rum Jungle,Port Pirie和Ben Lomond。迄今为止,许多数据尚未得到彻底评估。编译和评估此数据的需求是双重的。首先,评估铀生产释放的负荷,作为核燃料循环生命周期分析的输入,例如,由航天科委会和工业集团进行的分析。其次,需要为suitable气的通量设定合适的设计标准,以恢复以前和现在的铀项目。本文将对such通量和负荷进行详细的汇编,然后将其用作生命周期分析的基础,并为setting设定适当的针对特定场所的恢复标准。然后讨论了以前和当前项目的含义以及未来的数据需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号