首页> 外文会议>SPE/CERI gas technology symposium >Reducing water production in a naturally fractured gas well using sequential gel/gas slug injection
【24h】

Reducing water production in a naturally fractured gas well using sequential gel/gas slug injection

机译:通过顺序注入凝胶/气塞,减少天然裂缝气井中的产水量

获取原文
获取原文并翻译 | 示例

摘要

The application of gels for the control of excessive water production in oil and gas wells has been a treatment alternative for several years. The success of these treatments; however, has been relatively low. The Talisman Energy Inc. (Talisman)-operated Sukunka, British Columbia field pilot was conducted in conjunction. with an ongoing research project at teh Petroleum Recovery Institute to imprve water abatement techniques in gas reservoirs. Sequentially injecting multiple slugs of gelant followed by gas allows for gel placement in the water conducting fractures or high permeability channels, while the gas overrides and reconnects to the upper gas zone.
机译:几年来,将凝胶用于控制油气井中过多的水生产已成为一种治疗选择。这些治疗的成功;但是,相对较低。由Talisman Energy Inc.(Talisman)经营的不列颠哥伦比亚省Sukunka实地试点是同时进行的。与石油采收研究所正在进行的一项研究项目一起,致力于改善气藏中的节水技术。依次注入多段胶凝剂,然后注入气体,可将凝胶放置在导水裂缝或高渗透率通道中,而气体则覆盖并重新连接到上部气体区。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号