Water and Gas Control Jobs in Indian Offshore Field (Bombay High) - Trends and Case Studies.

机译:印度近海油田(孟买高地)的水和天然气控制工作-趋势和案例研究。

获取原文
获取原文并翻译 | 示例

摘要

Bombay high, an offshore oil field was discovered in the yearrn1974 and was put on production in May1976. Water injectionrnin this field was started in 1984. The main pay zone L-III is ofrnmiocene age. L-III is a multilayered, anisotropic limestonernreservoir with a gas cap and partial water drive. L-III reservoirrnof this has 13 different sub layers, which are separated byrnshale streaks.rnWater Shut off jobs: Bombay high wells startedrnproducing water since 1984-85. Preferential depletion of highrnpermeability layers in a set of high and low permeabilityrnlayers perforated together and subsequent preferential floodingrnof these layers has led to an early break through of water asrnwell as water loading of wells. This has also led to the leavingrnoil un-drained in less permeable layers. Earlier attempts tornshut off water with conventional squeeze jobs met with a littlernsuccess. However candidate selection with proper diagnosticsrnand mechanical isolation of the squeezed layer has resulted inrnremarkable success. But this could not address to the middlernwater producing zones. In order to overcome the limitations ofrnconventional cement squeeze jobs and in search of betterrnsuccess ratio on sustained basis and with the advent of variousrngel–chemicals, a number of gels of reputed companies werernused during 1993-97 for water shut off jobs. However thernresults were not encouraging either. Recently during 1999-rn2000, extensive lab studies were done on cores simulated atrnreservoir conditions and the compatible gels were used. Threernwater shut off jobs have been done using these gels.rnGas shut off jobs: Success ratio remained low withrnthe cement squeeze in between the oil producing and gasrnbearing layers. This increased remarkably with improvedrndiagnosis by multidisciplinary team, use of clean work overrnfluid and mechanical isolation of the squeeze point withrnpacker. Recently during 1999-2000, various gels were testedrnfor compatibility with reservoir rock and fluid andrnaccordingly the compatible gels were used in combinationrnwith cement cap for Gas shutoff jobs in 6 wells. Test resultsrnof 4 wells have shown that two of the four wells have beenrnsuccessful. With improved placement technique the jobs arernexpected to be more successful.
机译:孟买高地,一个海上油田,于1974年被发现,并于1976年5月投入生产。该油田的注水始于1984年。主要的L-III产区是中新世。 L-III是一个多层的各向异性石灰石储层,带有气顶盖和部分水驱。 L-III储层有13个不同的子层,由页岩条纹隔开。停水工作:孟买的高井从1984-85年开始生产水。在一组高和低渗透率的地层中穿孔在一起的高渗透率层的优先枯竭,以及随后这些层的优先驱替,导致了水溶胀的早期突破以及井中的水负荷。这也导致了膨松腈不易渗透的层不排水。较早的尝试以传统的挤压作业将水切断的尝试取得了一些成功。然而,通过适当的诊断和压缩层的机械隔离进行候选物选择已取得了巨大的成功。但这不能解决中水产区。为了克服常规水泥挤压工作的局限性,并在持续的基础上寻求更好的成功率,并且随着各种化学品的问世,在1993-97年间,许多知名公司的凝胶被用于关闭水的工作。然而,结果也不令人鼓舞。最近在1999年至2000年期间,对模拟储层条件的岩心进行了广泛的实验室研究,并使用了兼容的凝胶。使用这些凝胶可完成三次水关闭工作。气体关闭工作:由于生油层和含气层之间的水泥挤压,成功率仍然很低。随着多学科团队对诊断的改进,使用清洁流体的过剩流体以及挤压点包装机的机械隔离,这种情况显着增加。最近在1999-2000年间,对各种凝胶与储集岩和流体的相容性进行了测试,然后将相容的凝胶与水泥盖配合使用,用于6口井的天然气封堵工作。 4口井的测试结果表明,四口井中有两口成功。通过改进的放置技术,可以预期工作会更加成功。

著录项

  • 来源
  • 会议地点 Bahrain(BH);Bahrain(BH)
  • 作者

    G.K. Sinha; R Sinha;

  • 作者单位

    Oil and Natural Gas Corporation Ltd;

    Oil and Natural Gas Corporation Ltd;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 F437.62;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号