Commissioning of Hubble Space Telescope: the strategy for recovery

机译:哈勃太空望远镜的调试:恢复策略

获取原文
获取原文并翻译 | 示例

摘要

Abstract: When the space shuttle Endeavor rockets into orbit on December 2, 1993, NASA will begin the last phase of a three part program to recover from the disappointing beginnings of Hubble Space Telescope operations. The problem with the telescope was detected shortly after launch in April of 1990 and in June of that year NASA concluded that the primary mirror of the telescope had been manufactured with the wrong figure. NASA immediately began a detailed investigation to determine exactly what went wrong. Next, NASA and the HST community began a multi-effort program to maximize and improve the science produced by the telescope in its aberrated condition. Finally, plans were developed to repair the telescope's problems in orbit and to restore the observatory's full scientific potential. Much has been written about the failure to detect this flaw before launch. The impression of many outside the program is that Hubble is a complete failure. Far less has been written of the impressive efforts and successes as the recovery from this disappointing start evolved.!9
机译:摘要:1993年12月2日,奋进号航天飞机升空进入轨道时,美国宇航局将开始一项由三部分组成的计划的最后阶段,以从哈勃太空望远镜令人失望的开局中恢复过来。在1990年4月发射后不久就发现了望远镜的问题,同年6月,美国宇航局得出结论认为,望远镜的主镜是用错误的形状制造的。 NASA立即开始了详细的调查,以确定到底出了什么问题。接下来,美国国家航空航天局(NASA)和HST社区开始了一项多重努力计划,以最大限度地提高和改进望远镜在畸变状态下产生的科学。最后,制定了计划以修复望远镜在轨道上的问题并恢复天文台的全部科学潜力。关于在启动之前未能检测到此缺陷的文章很多。程序外的许多人的印象是,哈勃完全失败了。随着从这个令人失望的开始的复苏演变而来,令人印象深刻的努力和成功的著作还很少。9

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号