首页> 外文会议>Conference on space astronomical telescopes and instruments >Commissioning of Hubble Space Telescope: the strategy for recovery
【24h】

Commissioning of Hubble Space Telescope: the strategy for recovery

机译:哈勃太空望远镜调试:恢复策略

获取原文

摘要

When the space shuttle Endeavor rockets into orbit on December 2, 1993, NASA will begin the last phase of a three part program to recover from the disappointing beginnings of Hubble Space Telescope operations. The problem with the telescope was detected shortly after launch in April of 1990 and in June of that year NASA concluded that the primary mirror of the telescope had been manufactured with the wrong figure. NASA immediately began a detailed investigation to determine exactly what went wrong. Next, NASA and the HST community began a multi-effort program to maximize and improve the science produced by the telescope in its aberrated condition. Finally, plans were developed to repair the telescope's problems in orbit and to restore the observatory's full scientific potential. Much has been written about the failure to detect this flaw before launch. The impression of many outside the program is that Hubble is a complete failure. Far less has been written of the impressive efforts and successes as the recovery from this disappointing start evolved.
机译:1993年12月2日的航天飞机努力进入轨道轨道时,美国宇航局将开始三部分计划的最后一阶段,以从哈勃太空望远镜业务的令人失望的开始中恢复。在1990年4月发布后,望远镜的问题是在1990年4月发布的,同年6月,美国宇航局的结论是,望远镜的主要镜子已经用错误的数字制造。美国宇航局立即开始进行详细的调查,以确定出了什么问题。接下来,美国宇航局和HST社区开始了一个多努力计划,以最大限度地提高和改善望远镜在异常情况下产生的科学。最后,开发了计划以修复望远镜在轨道上的问题,并恢复天文台的全部科学潜力。在发布之前没有写过未能检测到这个缺陷。该计划的许多外部的印象是哈勃是完全的失败。由于这一令人失望的开始发展,令人印象深刻的努力和成功的方式是令人印象深刻的努力和成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号