Major engineering challenges in design and construction for the Singapore downtown line stage 1 project

机译:新加坡市区1号线项目设计和施工中的主要工程挑战

获取原文
获取原文并翻译 | 示例

摘要

Design and construction of the Down Town Project stage 1 (DTL1P) presents a large number ofrngeotechnical and engineering challenges. It comprises seven stations and associated connecting cut and coverrnand bored tunnels in the heart of urban Singapore. These challenges are driven by the variable ground, rangingrnfrom very strong sedimentary deposits to recently reclaimed very soft Marine Clay. To ensure a successfulrnproject a structured risk approach was employed to identify hazards and put in place engineering solutions tornenable work to proceed safely and with minimal impact to the surrounding public. A number of different andrnnovel design approaches were utilised across the contracts several of them are reviewed.
机译:市区项目第一阶段(DTL1P)的设计和施工提出了许多岩土技术和工程挑战。它包括七个车站以及在新加坡市中心的相关连接的挖切,覆盖和挖洞隧道。这些挑战是由变化不定的地面驱动的,从非常强的沉积物沉积到最近回收的非常软的海相粘土。为了确保项目成功,采用了结构化风险方法来识别危害,并采用工程解决方案来进行可破坏的工作,从而安全地进行工作,并且对周围公众的影响最小。在整个合同中使用了许多不同的Andrnnovel设计方法,其中有几篇进行了回顾。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号